
Water Storage Tank (VST) - Steel
Water Storage Tank - Steel
Project Overview
The project involves the fabrication, erection, welding, surface preparation, coating, hydrostatic testing, and insulation of a large welded steel water storage tank, including all associated accessories and appurtenances required for complete installation and commissioning.
Client
Agricultural Companies
Location
KSA | UAE | GCC
Technical Details
Systems Implemented
Crops Grown
Project Gallery
Visual documentation of our construction process and final results

Project Scope
Comprehensive deliverables and services provided for this project
Deliverables
Key Achievements
Timeline
Completed on schedule with zero delays
Quality
Exceeded client expectations with premium materials and workmanship
Safety
Zero safety incidents throughout the project duration
Compliance
Full compliance with local regulations and international standards
Our Process
Planning
Site assessment and project design
Foundation
Concrete work and structural preparation
Construction
Framework and systems installation
Technical Specifications
Detailed technical parameters and project metrics
Facility Details
10,000 m²
2,000 tons/year
Climate-controlled environment
Environmental Control
Advanced irrigation system
Automated ventilation
Efficient heating system
Modern cooling technology
Project Management
8 months